
Colorado Yurts
Yurt Pitching & Setup
Everything you need to raise your Colorado Yurt — pitching options, the official step-by-step guide, tool lists, deck plans, and answers to the most common questions.
Pitching Options
Pitch your own yurt with a small crew, hire a local contractor (often the same person who builds your deck), or talk to us about having the Secret Creek crew install it for you.
Pitch It Yourself
Grab a group of friends or family and follow our step-by-step guide. Most yurts can be raised in 1–3 days with a small crew using the included instructions, with phone and video support from our team along the way.
Hire a Contractor
Many customers hire the same contractor who built their deck to also pitch the yurt. We provide complete documentation and are happy to talk through the process with your builder.
Hire Our Crew
Prefer a turn-key install? Contact our Sales Guides about hiring the Secret Creek crew to come pitch your yurt for you in supported regions.
What's Inside the Guide
A quick look at each section so you know what to expect before you start.
Getting Ready
Deck prep, bender board, unpacking, and a safety warning about wind.
Tools & Supplies
Full checklist including drills, wrenches, ladders, and our scaffolding recommendation.
Setting Up the Yurt Frame
Lattice, door, cable, rafters, and raising the compression ring (with and without scaffolding).
Insulation & Roof Fabric
Roof insulation, installing the roof fabric, and finishing the perimeter.
Wall Insulation & Wall Fabric
Hanging insulation and the exterior fabric wall.
Door & Dome
Plumbing the door, installing the dome, and the dome-lifter mechanism.
Options & Finishing Touches
Cable ties, fan mount, wind-load studs, cistern, and glass windows.
Platform & Deck Plans
Foundation, beam, and floor layouts for 16'–30' yurts.
Before You Start
- Never pitch in wind. Even moderate winds can be dangerous until the yurt is fully secured.
- Have your deck ready with bender board installed. See the deck plans in the back of the guide.
- Read the packing list first. Confirm every item is accounted for before you start.
- Report damage immediately by calling Secret Creek at (970) 240-2111.
Scaffold Heights by Yurt Size
Recommended height to the top of the compression ring. Subtract 3" for scaffold height, add 16" for height with dome.
| Yurt Diameter | Ring Height |
|---|---|
| 16' | 10'-5" |
| 20' | 11'-4" |
| 24' | 12'-10" |
| 27' | 13'-7" |
| 30' | 14'-4" |
*Plus or minus one inch.
Pitching Questions
Common questions about who pitches your yurt, what's involved, and how to plan your project.
Who Pitches My Yurt?
Compare DIY, contractor, and full-service install paths.
Steps to Building Your Yurt Project
From site selection to move-in day, the full project arc.
What's Involved in a Yurt Project?
Permits, utilities, lead times, and budgeting essentials.
